Insitu bases must be provided at the sizes required for specific site ground conditions. These should be finished to a tolerance of 20mm of the required level.

The Poundfield L Blocs should be placed onto the insitu bases using the L Bloc lifting bracket (each unit weighs approx. 1.5T) Once lined and levelled the units are to be fixed down to the base with 4No M20 stainless steel resin anchors bolted through the preformed holes of the L Blocs.

The Poundfield brickfaced panel can now be positioned. These units weigh approx. 5.1T and must only be lifted using the lifting anchors cast into the top face. They are to be set onto the insitu base with metal shims and high strength mortar beneath the bearing surface. The wall is then fixed to the stabilising L Bloc using the cast-in stainless steel channel and M20 stainless
steel bolts (4N0 per end) - a 5mm neoprene rubber strip is placed between the 2 sections to ensure an equal bearing.

The wall is now stable and can be backfilled - the first 300mm behind the wall must be free-draining granular material . Vertical joints between panels are to be sealed with a colour matched polysulphide sealant and backing rod. Sealant may be omitted if required.

 
Poundfield L-blocs are installed at 6 metre intervals

Panels are lifted into position

    



Panels are fixed to ‘L’s with stainless steel bolts

 

Finished Wall

  

  Instructions For   
  Handling & Installation  

 


^ TOP ^
ALFABLOC & MINI ALFABLOC FEATURES  BETABRIC BOUNDARY WALL FEATURES  BETABRIC RETAINING WALL FEATURES   LBLOC FEATURES  2M LBLOC FEATURES
ALFABLOC TECHNICAL  MINI ALFABLOC TECHNICAL  BETABRIC BOUNDARY WALL TECHNICAL  BETABRIC RETAINING WALL TECHNICAL  LBLOC TECHNICAL  2M LBLOC TECHNICAL  
ALFABLOC INSTALLATION  BETABRIC BOUNDARY WALL INSTALLATION  BETABRIC RETAINING WALL INSTALLATION  LBLOC INSTALLATION
ALFABLOC ACCESSORIES  LBLOC ACCESSORIES  PRODUCT RANGE  HOME   ABOUT US  NEWS  CONTACT US